翻訳と辞書 |
Ara Canal
Ara Canal extends from Incheon district Seo-gu to Seoul Gangseo-gu. It was built in 2012. The purpose of the canal is to provide flood control and be used in leisure pursuits. == History == Choe I, son of Choe Chung-heon, attempted to construct a canal in the Goryeo period. It failed due to technological infeasibility. One of the chosun kings also tried and failed. The Gulpocheon river waterproof road project was started in 1992. Gulpocheon's limitation was lack of water flow. In particular, there was a flood in the summer of 1987, resulting in six thousand flood victims in Incheon area. To solve this problem, Gulpocheon waterproofing was undertaken, starting with a five-year survey. In 1995, the Gyeongin canal project was planned and controversies followed over the next 20 years. The project was started in 2009 and completed in 2012.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Ara Canal」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|